Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Support proactive maintenance

Support proactive maintenance

Unit of competency
National Code
MSS404083A
State Code
WD544
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
02/05/2012
State Implementation and Classification
Approved Date
04/08/2014
Field of Education
080317 - Quality Management
Original Release Date
04/08/2014
Nominal Hours
50
Description
This unit of competency covers the skills and knowledge required to lead a production team/work group or maintenance team in a proactive maintenance environment.
Notes
Elements and Performance Criteria
1 Lead team in monitoring process and equipment
  • 1.1 Demonstrate to team how to observe the process/equipment continuously and critically using appropriate senses (e.g. sight and hearing) to identify any potential or actual problems
  • 1.2 Identify to team data indicators that must be monitored and recorded
  • 1.3 Ensure team monitors identified data indicators frequently and critically
  • 1.4 Ensure symptoms of operations outside the desired range of conditions and performance are recognised
  • 1.5 Analyse cause of equipment non-standard performance within scope of knowledge and skill
  • 1.6 Ensure team members take timely and appropriate action to solve problems or to refer problems to appropriate manager or specialist
2 Apply proactive maintenance strategy
  • 2.1 Obtain and discuss maintenance strategy with relevant people
  • 2.2 Identify aspects of maintenance strategy which require specific input from team
  • 2.3 Discuss maintenance strategy with team members
  • 2.4 Ensure team members have resources and training to be able to make the required contributions
3 Analyse standard procedures and work practices
  • 3.1 Examine team procedures and practices for compatibility with maintenance strategy
  • 3.2 Identify areas where production procedures/practices should be changed to comply with maintenance strategy
  • 3.3 Identify areas where maintenance strategy should change to comply with production procedures and practices
  • 3.4 Identify other activities or areas where changes might increase equipment reliability
  • 3.5 Take appropriate action to have the required changes made
4 Facilitate team contribution to proactive maintenance
  • 4.1 Monitor team's contribution to proactive maintenance
  • 4.2 Arrange for competency development of team members, as required
  • 4.3 Facilitate ongoing examination by the team of process reliability and overall equipment effectiveness (OEE)
  • 4.4 Arrange for follow through and implementation of team originated improvements
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Competitive systems and practices

Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP), and proprietary systems statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
OEE
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
Team
Team may include:
work teams from all sections of the organisation including production, maintenance, technical, administration/finance and sales/marketing
a formally designated team or a group of employees in a common work area
Proactive maintenance strategies and associated analyses
Proactive maintenance strategy and associated analyses may include:
TPM and RCM
root cause analysis (RCA)
mean time between failures (MTBF)
failure mode and effects analysis (FMEA)
condition monitoring
TPM
TPM is an application of total quality management to maintenance with the intention of increasing reliability, getting it right first time and increasing OEE
RCM
RCM moves maintenance from reactive, or even planned/programmed, towards a focus on uptime and OEE
OEE
OEE is the combination of the main factors causing loss of productive capacity from equipment/plant and is:
OEE = availability x performance x quality rate
where:
availability takes into account losses due to breakdown, set-up and adjustments
performance takes into account losses due to minor stoppages, reduced speed and idling
quality rate takes into account the losses due to rejects, reworks and start-up waste
MTBF
MTBF is one key measure of the effectiveness of a maintenance procedure, and is an indicator as to whether root causes are being found and resolved. If MTBF is reducing, then it is an indicator that the maintenance regime is failing
FMEA
FMEA is a systematic approach that identifies potential failure modes in a system, product, or operations/assembly operation caused by either design or operations/assembly process deficiencies. It also identifies critical or significant design or process characteristics that require special controls to prevent or detect failure modes. FMEA is a tool used to prevent problems from occurring.
Some industry sectors have highly adapted forms of FMEA and may practice traditional FMEA in say their routine maintenance while using another technique, such as Hazard and Operability Studies (HAZOP) for design and modification.
HAZOP is a form of FMEA which has been practiced by the process industries for over 30 years and examines the implications of changes in process conditions to process stability.
Condition monitoring
Condition monitoring often involves quite sophisticated monitoring of equipment, including such things as:
vibration monitoring
instrumental analysis of lubricating oil, and so on, to determine the current state of the equipment, monitor the change in this condition, and predict when it needs servicing/maintenance to maintain reliability
For this unit an awareness level only of condition monitoring and its implications for team operations is required.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
communicate effectively with team on the proactive maintenance strategy being adopted and the role expected by the team in its implementation
identify data required from team and for team key from the proactive maintenance strategy
analysing proactive maintenance strategy and current work practices of the team to identifying opportunities for better fit
differentiate between proactive and traditional maintenance strategies.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Replaces
State Code National Code Title Type
W9012 MSACMT483A Support proactive maintenance Unit of competency
Replaced By
State Code National Code Title Type
BAK07 MSS404083 Support proactive maintenance Unit of competency