Unit of competency Outline
Date retreived
23/07/2026 5:23 PM AWST
23/07/2026 5:23 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Erect and dismantle restricted height scaffolding
Erect and dismantle restricted height scaffolding
Unit of competency
National Code
CPCCCM2008
CPCCCM2008
State Code
OAP32
OAP32
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/04/2019
Field of Education
040329 - Scaffolding And Rigging
Original Release Date
12/04/2019
Nominal Hours
16
Description
This unit specifies the skills and knowledge required to erect and dismantle restricted height scaffolding to provide work platforms for various occupational applications. This unit is restricted to modular scaffolding to a height of 4 metres and includes:placement of safety barriersthe application of knowledge to handle, erect and dismantle a range of restricted height scaffolding systems.It applies to workers who work in a range of industries. It involves working in a team environment.No licensing, legislative, or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan to erect scaffolding up to 4 metres.
- 1.1 Reviewscaffolding task and workplace-specific information relating to the task and confirm with associated personnel.
- 1.2 Identify environmental protection and legislativerequirements for scaffolding task and incorporate into planning and preparation.
- 1.3 Identify hazards, control measures and equipment associated with the workplace and scaffolding task from job safety analysis (JSA) and safe work method statement (SWMS).
- 1.4 Calculate scaffolding and material requirements and incorporate into planning and preparation.
- 1.5 Determine expected loading on scaffold and supporting structure using load tables, and incorporate into planning and preparation.
- 1.6 Identify site access and egress routes and incorporate into planning and preparation.
- 1.7 Plan scaffolding task in accordance with workplace requirements.
2. Prepare to erect scaffolding up to 4 metres.
- 2.1 Apply risk control measures and equipment including installing safety signs and barriers and using personal protective equipment (PPE).
- 2.2 Select plant, tools and equipment, check for serviceability and rectify or report any faults.
- 2.3 Select, prepare and locate materials using safe handling techniques.
- 2.4 Inspect scaffolding and components and label, reject or repair damaged items.
3. Erect scaffolding up to 4 metres.
- 3.1 Establish footing in accordance with the Australian Standard for scaffolding.
- 3.2 Erect scaffolding in accordance with regulations, planned risk prevention and control measures, acceptable safe work practices and manufacturers’ specifications.
4. Inspect, repair and alter scaffolding up to 4 metres.
- 4.1 Inspect critical structural and safety areas of scaffolding for damage, corrosion and wear.
- 4.2 Check current use of scaffolding for compliance with type of scaffolding equipment.
- 4.3 Review scaffolding to determine if changes or modifications were scheduled as per original planning.
- 4.4 Carry out alterations or repairs.
- 4.5 Complete inspection log and handover.
5. Dismantle scaffolding up to 4 metres and clean up.
- 5.1 Dismantle scaffolding using reverse of procedure for erection.
- 5.2 Clear work area and dispose of, reuse or recycle materials in accordance with legislation, regulations, codes of practice and task specifications.
- 5.3 Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ specifications and workplace requirements.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE986 | CPCCCM2008B | Erect and dismantle restricted height scaffolding | Unit of competency |