Unit of competency Outline
Date retreived
22/07/2026 10:32 PM AWST
22/07/2026 10:32 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install, set up and commission interval metering
Install, set up and commission interval metering
Unit of competency
National Code
UEEEL0013
UEEEL0013
State Code
OCA61
OCA61
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
18
Description
This unit involves the skills and knowledge required to the install, set up and commission interval meter for measurement of energy use by consumers.It includes working safely in planning, installing and setting up interval electricity meter, and completing the necessary service metering documentation.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Prepare to install interval meter
- 1.1 WHS/OHS requirements and workplace procedures, for a given work area, are identified and applied
- 1.2 Health and safety hazards are identified, risks assessed and risk control measures and workplace procedures implemented in preparation for the work
- 1.3 Safety hazards not previously identified are noted on job safety assessments and existing risk control measures implemented
- 1.4 Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety, functionality and industry standards
- 1.5 Approval to rectify safety and/or functionality defects of the switchboard is sought from relevant person/s in accordance with workplace procedures
- 1.6 Electrical meter installation and/or rectification work is prepared in consultation with relevant person/s effected by the work and sequenced appropriately
- 1.7 Materials needed for meter work are obtained in accordance with workplace procedures and checked against job requirements and specifications
- 1.8 Tools, equipment and testing devices needed for meter work are obtained in accordance with workplace procedures and checked for correct operation and safety
2 Install interval meter
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 Need to test or measure live work is determined in accordance with WHS/OHS requirements and conducted within workplace safety procedures
- 2.3 Existing meter is checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- 2.4 Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures
- 2.5 Meter is installed to comply with relevant technical industry standards, job specifications and requirements
- 2.6 Meter power and communication connections are made in accordance with manufacturer specifications, functional and regulatory requirements
- 2.7 Meter operating parameters are set in accordance with manufacturer specifications, functional and regulatory requirements
- 2.8 Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment and with the approval of an authorised person/s
- 2.9 Ongoing checks of the quality of installed apparatus are undertaken in accordance with workplace procedures
- 2.10 Meter installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles
3 Complete and report meter installation activity
- 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed and supply is reinstated to the installation in accordance with regulator and industry standards
- 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
- 3.3 Final inspection and tests are made to ensure the installed meter conforms to job requirements
- 3.4 'As-installed' meter or rectification work is documented and appropriate person/s notified in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S7328 | UEENEEG171A | Install, set up and commission interval metering | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEE77 | UEEEL0078 | Install and commission whole current electricity meters | Unit of competency |