Qualification Outline
22/07/2026 3:50 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate IV in Electrical - Photovoltaic systems
Certificate IV in Electrical - Photovoltaic systems
UEE42020
BFN9
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 2.00 | 14/10/2021 | Current | Approved |
| 1.00 | 05/10/2020 | Replaced | Approved |
Description
This qualification provides competencies to select, install, set up, test, fault find, repair and maintain electrical systems and equipment in buildings and premises.
It includes requirements and competencies to select, install, set up, test, fault find, repair and maintain photovoltaic (PV) systems and associated equipment.
No licensing, legislative or certification requirements apply to this qualification at the time of publication.
Schedule
Packaging Rules
A total of 440 weighting points comprising:- 260 core weighting points listed below; plus
- 180 general elective weighting points from the general elective units listed below.
Choose a total of 180 weighting points elective units from the list below, of which between 0 and 90 weighting points can be taken from Group A; between 0 and 90 weighting points can be taken from Group B; and between 90 and 180 weighting points can be taken from Group C (or all electives units of 180 weighting points can be taken from Group C).
Up to 90 weighting points of the general elective units Group A, may be selected, with appropriate contextualisation, from any relevant nationally endorsed Training Package or accredited course, provided that selected units contribute to the vocational outcome of the qualification. Previously assigned weighting points are listed in the UEE Electrotechnology Training Package Companion Volume Implementation Guide (CVIG), if not listed weighting points will be 10 points, unless directed from the Electrotechnology Industry Reference Committee (IRC).
There are units of competency within this qualification that contain pre-requisites. Units of competency that have a pre-requisite requirement are identified by this symbol *. Refer directly to the units of competency to identify pre-requisite requirements to ensure all are complied with. A list of all pre-requisites is also provided in the UEE Pre-requisite Companion Volume.
Where imported units are selected, care must be taken to ensure all pre-requisite units specified are complied with.
1. Core Units
All core units must be completed.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OCB37 | UEECD0010 | Compile and produce an energy sector detailed report | 54 | Unit of competency |
| OCA34 | UEERE0011 | Design grid-connected photovoltaic power supply systems | 54 | Unit of competency |
| OCA29 | UEERE0015 | Implement and monitor energy sector environmental and sustainable policies and procedures | 18 | Unit of competency |
| OCA17 | UEECD0024 | Implement and monitor energy sector WHS policies and procedures | 18 | Unit of competency |
| OBX49 | UEERE0016 | Install, configure and commission LV grid-connected photovoltaic power systems | 36 | Unit of competency |
| OCA61 | UEEEL0013 | Install, set up and commission interval metering | 18 | Unit of competency |
| OCB19 | UEECD0027 | Participate in development and follow a personal competency development plan | 18 | Unit of competency |
| OBX36 | UEERE0022 | Solve basic problems in photovoltaic energy apparatus and systems | 18 | Unit of competency |
2. Group A Imported and Common Elective Units
Between 0 and 90 weighting points can be taken from Group A.
Please refer to the packaging rules for the full details of available options.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OBX53 | UEECD0011 | Comply with scheduled and preventative maintenance program processes | 18 | Unit of competency |
| OCD34 | BSBOPS203 | Deliver a service to customers | 40 | Unit of competency |
| OBY02 | UEECO0002 | Maintain documentation | 18 | Unit of competency |
| OBU39 | ICTICT214 | Operate application software packages | 60 | Unit of competency |
| AXI38 | CPCCWHS1001 | Prepare to work safely in the construction industry | 6 | Unit of competency |
| OCA56 | UEECD0035 | Provide basic instruction in the use of electrotechnology apparatus | 18 | Unit of competency |
| OCD26 | HLTAID009 | Provide cardiopulmonary resuscitation | 4 | Unit of competency |
| OBY92 | UEECO0015 | Provide quotations for installation or service jobs | 18 | Unit of competency |
| OBY79 | UEECO0017 | Source and purchase material/parts for installation or service jobs | 18 | Unit of competency |
3. Group B Qualification Elective Units
Between 0 and 90 weighting points can be taken from Group B.
Please refer to the packaging rules for the full details of available options.
4. Group C Qualification Elective Units
Between 90 and 180 weighting points can be taken from Group C; or all 180 weighting points can be taken from Group C.
Please refer to the packaging rules for the full details of available options.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| A149 | UEE42011 | Certificate IV in Electrical - Photovoltaic systems | Qualification |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BIV5 | UEE43322 | Certificate IV in Electrical - Renewable Energy | Qualification |
No information
Entry Requirements
The entry requirement for this qualification is:
UEE30820 Certificate III in Electrotechnology Electrician
or
a current ‘Unrestricted Electricians Licence’ or its equivalent issued in an Australian state or territory.