Unit of competency Outline
Date retreived
23/07/2026 3:55 AM AWST
23/07/2026 3:55 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop the application of enterprise control systems in an organisation
Develop the application of enterprise control systems in an organisation
Unit of competency
National Code
MSS405060A
MSS405060A
State Code
WD571
WD571
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/08/2014
Field of Education
080317 - Quality Management
Original Release Date
04/08/2014
Nominal Hours
60
Description
This unit of competency covers the skills and knowledge required to continuously modify and improve or develop new enterprise-wide information technology (IT) based control systems, such as Supervisory Control and Data Acquisition (SCADA), Enterprise Resource Planning (ERP), Materials Resource Planning (MRPII) and similar. Typically the development of such a system will be in liaison with an appropriate technical expert who may be an internal expert or an external consultant.
Notes
Elements and Performance Criteria
1 Monitor information and control needs of organisation
- 1.1 Check the use of current information
- 1.2 Check the operation of current control systems
- 1.3 Communicate regularly with key information users regarding any new or changed information control needs, including information needs from and to value stream
- 1.4 Identify short comings in information and control provision
- 1.5 Take appropriate action on information and control needs to meet organisational needs
2 Check the current system against organisation needs
- 2.1 Check the routine use of the system
- 2.2 Check any system alarm or non-conformance notification and control operation
- 2.3 Communicate regularly with key stakeholders about current system use and application
- 2.4 Determine effect of non-conformance on enterprise system
- 2.5 Identify problems/issues
- 2.6 Take appropriate action on problems and issues
3 Determine developments needed in a new or significantly modified system
- 3.1 Identify needs requiring a new system or development of modifications to the current system
- 3.2 Draft scope, specifications and outcomes required
- 3.3 Liaise with key stakeholders and relevant technical experts to refine scope, specifications and outcomes needed in new or modified system
- 3.4 Agree final scope, specifications and outcomes
4 Develop system
- 4.1 Develop project plan
- 4.2 Ensure ongoing consultation with all relevant stakeholders
- 4.3 Manage development project
- 4.4 Manage trialling of modified system
- 4.5 Ensure modified system meets organisational requirements
5 Implement modified system
- 5.1 Liaise with all affected personnel
- 5.2 Develop and agree an implementation strategy
- 5.3 Ensure all personnel have required skills
- 5.4 Implement modified system
- 5.5 Monitor implementation and modify, as required
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as SCADA software, ERP systems, MRP and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action
In the continuous operations sector, the SCADA system is sometimes integrated into other sophisticated computer control systems, such as distributed control system (DCS) and indeed these systems do merge in advanced systems. These organisations may simply refer to their SCADA as the DCS or other similar term (such as the proprietary name of the computer system)
Resource planning
Planning software is a general term applied to a number of software systems which integrate a range of business information, such as:
finance
logistics maintenance and production
It is frequently referred to by names, such as ERP and MRP/MRPII
Value stream
The value stream begins with the customer and includes all actions (both value adding and non value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as SCADA software, ERP systems, MRP and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action
In the continuous operations sector, the SCADA system is sometimes integrated into other sophisticated computer control systems, such as distributed control system (DCS) and indeed these systems do merge in advanced systems. These organisations may simply refer to their SCADA as the DCS or other similar term (such as the proprietary name of the computer system)
Resource planning
Planning software is a general term applied to a number of software systems which integrate a range of business information, such as:
finance
logistics maintenance and production
It is frequently referred to by names, such as ERP and MRP/MRPII
Value stream
The value stream begins with the customer and includes all actions (both value adding and non value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of their ability to:
analyse organisation needs and match to enterprise control system features
determine critical features required in enterprise control system
modify system as a result of trials or changing needs.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of their ability to:
analyse organisation needs and match to enterprise control system features
determine critical features required in enterprise control system
modify system as a result of trials or changing needs.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9025 | MSACMT660A | Develop the application of enterprise systems in manufacturing | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAJ80 | MSS405060 | Develop the application of enterprise control systems in an organisation | Unit of competency |