Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Estimate electrotechnology projects
Estimate electrotechnology projects
Unit of competency
National Code
UEECO0001
UEECO0001
State Code
OCA06
OCA06
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
080301 - Business Management
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to estimate material and labour costs for competitive quotation/tenders for electrotechnology work exceeding $AUD20,000.It includes reading and understanding job specifications, adjusting for material take-offs, determining labour and site requirements, costing and documenting.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine project scope
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied
- 1.2 Hazards are identified, risks are assessed and control measures are implemented
- 1.3 Extent of the project is determined from design brief specifications, other relevant documentation and discussions with appropriate person/s
- 1.4 Estimated completion date is determined from design brief specifications, other relevant documentation and discussions with appropriate person/s
- 1.5 Project activities are planned to meet scheduled timeframes in consultation with relevant person/s
2 Estimate electrotechnology project
- 2.1 Material take-offs are determined accurately and checked against job specifications
- 2.2 Materials, labour and other costs are determined from relevant workplace documentation
- 2.3 Sources and availability of materials and human resources required for the electrotechnology project are determined in accordance with workplace procedures
- 2.4 Estimates are checked and revised for accuracy in costing against job specifications in consultation with relevant person/s
- 2.5 Unplanned events are responded to in accordance with workplace procedures
3 Document and submit quotation
- 3.1 Project estimates are documented in accordance with workplace procedures
- 3.2 Quotation is forwarded to relevant person/s within specified timeframe
- 3.3 Quotation documentation is filed in accordance with workplace policies and procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W7735 | UEENEEC005B | Estimate electrotechnology projects | Unit of competency |