Unit of competency Outline
Date retreived
23/07/2026 9:18 PM AWST
23/07/2026 9:18 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Troubleshoot irrigation systems
Troubleshoot irrigation systems
Unit of competency
National Code
AHCIRG338
AHCIRG338
State Code
OBJ91
OBJ91
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
28/01/2020
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
28/01/2020
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to locate and identify irrigation system faulty components and blockages, shut down and isolate components, replace faulty components, clear blockages and return irrigation system to normal operating status.The unit applies to individuals who troubleshoot irrigation systems under broad direction and take responsibility for their own work.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Locate and identify faulty components and blockages
- 1.1 Determine irrigation system and component function
- 1.2 Check and review monitoring and maintenance records
- 1.3 Identify potential hazards and risks and implement safe working practices to manage risks
- 1.4 Minimise environmental impacts of irrigation maintenance activities
- 1.5 Select, fit and use personal protective equipment applicable to the task
- 1.6 Carry out operational tests on components
- 1.7 Identify and document faulty components and blockages
2. Shut down and isolate component
- 2.1 Apply shut down sequence and isolation procedures according to irrigation equipment handbook
- 2.2 Verify safe shutdown or isolation
- 2.3 Install safety or security lock off devices and signage
3. Replace faulty components and clear blockages
- 3.1 Organise access to faulty components and blockages
- 3.2 Remove and repair or dispose of faulty components
- 3.3 Select and install replacement components
- 3.4 Clear blockages or replace blocked sections
4. Return system to normal operating status
- 4.1 Return isolated or shutdown components to service
- 4.2 Carry out operational tests
- 4.3 Return system to normal operational set-up
- 4.4 Report and record repair activities according to workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAN50 | AHCIRG306 | Troubleshoot irrigation systems | Unit of competency |